London Borough of Havering

Home / Case Studies / London Borough of Havering

Housing

Case Study

We are delivering cyclical painting, decorating and repairs across various LB Havering owned properties including leaseholders in the borough. This involves us carrying out a pre-condition survey to every individual property, then applying our agreed schedule of rates to the quantities.

Green-painted communal railings and planters on the Barnstaple Estate, Harold Hill
Bin store redecorated free of charge as social value works in Havering
Redecorated communal railings on the Barnstaple Estate, Havering

Scope of Works

  • Internal decoration to communal corridors and stairwells
  • External decoration and associated repairs
  • FRA works to blocks

Duration

7 years

Internal decoration is carried out within communal corridors and stairwells using a Euroclass B fire retardant and anti-graffiti system. External decoration is being carried out to houses and blocks including to gutters, downpipes, doors, windows, roughcast render, boundary communal fencing, and metalwork. Any required pre-paint repair works are also carried out such as replacement of fascias and soffits, windows, doors, gutters and downpipes.

We are carrying out FRA works to blocks with external cladding which consists of removing existing cladding, replacing insulation, followed by the installation of a fire barrier as per engineers' drawings and specification. These are complex jobs and we work in conjunction with LB Havering's Building Control Team closely on delivery.

Social Value

We have recently carried out internal and external decoration works to thirteen three-storey blocks located within The Barnstaple Estate on Harold Hill. The estate is governed by the BETRA Tenant Management Organisation (TMO), formed to give back some power to residents, working together with Havering Council and across the community to improve the neighbourhood and the lives of BETRA’s residents.

Following completion of the planned works, it was picked up by the TMO that the communal surrounding area metal railings, benches, lampposts, planters and bin shed doors were in poor condition. As part of our Social Value commitment, we offered to redecorate all external communal areas free-of-charge, as well as carrying out repair works to the bin shed door timbers, giving the area a much-needed refresh and complementing the planned decoration works already completed.

“I cannot thank the team enough for their continuous efforts and hard work on our estate. These improvements have been noticed by many, and I cannot express my thanks enough. Thoroughly appreciate the improvements on our TMO estate.”

BETRA TMO Estate Manager

View all case studies View our services

Have a question or looking for a quote?

Our friendly team will be happy to help you

Get in touch
ISO 9001 2015 logo
ISO 14001 2015 logo
ISO 45001 2018 logo
Information Commissioner's Office logo
Builders Profile logo
Scottish Decorators Federation logo
Alcumus SafeContractor logo
Chas logo
Supply Chain Sustainability School Bronze Member, Living wage foundation and PDA logos
constructionline gold member logo
committed disability confident logo
Once For All accreditation logo
citation approved logo awarded to trident
make a stand association logo
armed forces covenant logo
Reset logo
Cyber Essentials logo
Mental Health at Work