trident maintenance services logo trident maintenance services logo

Glasgow Royal Infirmary Car Park

Home / Case Studies / Glasgow Royal Infirmary Car Park

Facilities Management

Case Study

We secured this 5 year contract with Glasgow Royal Infirmary through our strategic partnership with Imagile Professional Services to provide painting and repairs of structural steelwork.

photo of work carried out for Glasgow Royal Infirmary carpark
photo of work carried out for Glasgow Royal Infirmary carpark
photo of work carried out for Glasgow Royal Infirmary carpark

Scope of Works

  • Steel stripping preparation using dry blasting techniques
  • Re-painting of steel structures using intumescent coatings

Duration

5 Years

The Glasgow Royal Infirmary car park covers five floors and is open 24 hours a day, 365 days a year. We secured this contract through our strategic partnership with Imagile Professional Services to provide painting and repairs of structural steelwork, completing one floor each year for the five-year duration.

The key to a high-quality paint finish in steel stripping is the preparation – if the steel has not been properly prepared, no amount of paint will give a quality long-lasting finish. So, with this in mind, we have adopted a technique of dry blasting using various levels of compressed air to force an abrasive steel media onto the surface to be cleaned. This removes all previously applied paint including rust spots to create a solid and clean surface for painting and enabling achievement of the 20-year guarantee.

The product chosen is from Jotun Paints and is spray applied to achieve a 30-minute fire retardant, cellulosic fire protection. The Jotun thin film intumescent coatings are specifically formulated to provide a chemical reaction upon heating, changing physical form to provide fire protection through a thermal insulation and cooling effect that achieves the desired intumescent coating value.

We are focusing on one floor level at a time which we divide into three distinct areas, all of which is encased in clear heavy-duty sheeting to allow in the light, reduce the noise to the surrounding area and also preventing any debris from leaving the work area. To gain access, an ‘airlock’ passageway is created allowing the operative to test their PPE before entering the work area.

Working with the car park management team to achieve the highest levels of public safety, we developed a detailed Traffic Management Plan during mobilisation which allows the car park to be open at all times, whilst reducing as far as possible the disruption to those using the facilities.

View all case studies View our services

Have a question or looking for a quote?

Our friendly team will be happy to help you

Get in touch
ISO 9001 2015 logo
ISO 14001 2015 logo
ISO 45001 2018 logo
Information Commissioner's Office logo
Builders Profile logo
Supply Chain Sustainability School Bronze Member logo
Scottish Decorators Federation logo
Alcumus SafeContractor logo
Chas logo
Living wage foundation logo
constructionline gold member logo
committed disability confident logo
acclaim accreditation logo
citation approved logo awarded to trident
make a stand association logo
armed forces covenant logo
Reset logo
Cyber Essentials logo